By Felsner S.

Show description

Read or Download A 32-Approximation for the proportionate two-machine flow shop scheduling with minimum delays PDF

Similar technique books

Additional resources for A 32-Approximation for the proportionate two-machine flow shop scheduling with minimum delays

Example text

Zaha Hadid Architects, Hungerburgbahn, Innsbruck, 2007 Four new stations of the cable railway connect Innsbruck city centre with the surrounding mountains. Every station has a free-formed glazed roof and solid concrete plinths. Although different in geometry, together they create a family with a highly recognisable formal language. The architectural goal was the creation of continuous, homogeneous surfaces without obtrusive joints and fixings. Only glass provided the desired surface qualities and thermal standards.

In  Konrad Wachsmann perceived the principles of industrialisation as similar to those of mass production. The benefit of automation is only attainable through quantity in production, a principle that distinguishes industrialisation from craftsmanship. To guarantee the sound assembly of massproduced objects, Wachsmann introduced a system of modular coordination that defines the properties and quality of products. A superior universal module coordinates the different categories of modules such as geometry, tolerances, construction and so on.

This provides little opportunity for creative engineering solutions at the generative stage. Optioneering, a new business management model, however, offers the possibility of a new collaborative method for interaction between designers and their partners.

Download PDF sample

Rated 4.36 of 5 – based on 27 votes